Notes & details on tasks:


Click for details
2nd level floor joists

 

    50 year architectural laminated shingle.
    Grace Ice Water Shield 6 feet up from the eave, wrap dormer valleys, sidewalls 8 inches up
    30# felt
    6 nails,no staples
    drip edge on rakes and eaves (over iceguard)
    ridge vent (60% eave vent-40% ridge vent)
    set up for pv array
    new electrical panel
    Airfoil boxes or lessco polypans or intumescent fire caulk and airtight prep for drywall detailing
    fan support boxes (http://www.airfoilinc.com/products/products.html)
    200 amp panel